Tear out and replace an old floor
This suits a floor that's cracked through, sunken or dusting badly, where a patch would only hide the problem for a while. We take it down to the dirt, so the new slab starts on a base we built ourselves.
Garage floor cracked, sinking or crumbling to dust? We pour a new slab built for your car and tell you when to park on it.

Garage floor concrete in Azusa means breaking out the old slab, rebuilding the ground under it and pouring a new floor thick enough to carry your car. The work itself goes quickly. The longer part is usually the wait after the pour, while the slab cures before it can take a car's weight.
Most calls start the same way. There's a crack that keeps getting wider, a low spot where water sits after you wash the car, or a surface that's turning to dust under your shoes. The price mostly comes down to how big the garage is, how much old concrete has to come out, how much work the ground underneath needs and whether you want a plain or decorative finish. The schedule turns on the tear-out, the pour and the cure time before the car goes back in. If the driveway outside is in the same shape, I can look at both on the same visit. I'll measure everything on site and write your number down myself. Before work starts, we check with the city or county office that covers your address, and if a permit is needed, we pull it.
I come out to look at your garage and write the estimate myself, so the person who prices the job is the one who answers for it. Our own crew does the work, and I'm on site running it from tear-out to the last joint.
I learned concrete on new construction crews, pouring footings and slabs on empty lots. In 2013 I started this business to work on homes people already live in, which means working around cars, sprinklers, neighbors and a dog that wants to help.
We're fully licensed and insured. That matters on a garage job, because the crew is breaking out concrete a few feet from your house, your car and your water heater. Ask about it when I come out, and I'll go over it before any work starts.
We cover what's around the work and keep the mess in the garage and the truck, off your lawn. When we leave, the place is swept and the old concrete is gone. Our work is backed by our satisfaction guarantee. Call (626) 540-1248 to set up a visit.
Send the form or call (626) 540-1248, and we'll get back to you within one business day. I'll come out, look at the floor and write you a free estimate, with no obligation. If you know your garage's size in square feet, have it handy, because slab prices run by the foot.
In Azusa, the Building Division requires a permit when a structure is built, altered, repaired or torn down. Its list of work that skips a permit names driveways, not garage floors, so that list doesn't settle your job. The city asks you to start with the Planning Division to learn whether Design Review is needed, since that comes before the permit application. The city also says plan review is required in most cases, and the Building Division tells you whether your project needs it. We make that check before work starts, here and in the cities around us like Glendora and Covina.
Summer heat is the other thing that changes a pour here. The city has found that July, August and September often run above 100 degrees, with humidity usually under 40%. That kind of heat pulls water out of the top of a slab fast, which is how you get a weak, dusty surface later. In those months we pour early in the day, and the curing matters even more. Most garages we work on here have a tight driveway, a tree or two and sprinklers that need moving, and we work around all of it.
In the Los Angeles area, a new concrete garage floor slab usually costs about $8 to $15 per square foot. A slab reinforced with rebar or wire mesh costs more per foot than an unreinforced pad, and staining or stamping is priced on top of the slab. I'll measure your garage and give you your own number at the estimate.
Don't assume yours is exempt, because Azusa's list of work that skips a permit names driveways and not garage floors. The Building Division decides for your project. As covered above, we check before work starts and pull the permit if one is needed.
Los Angeles area guidance says to wait about a week before putting a car or other heavy load on a new slab, though you should be able to walk on it within 48 hours. Full cure takes about a month, 28 to 30 days, so the floor keeps gaining strength after you've parked on it. Plan on using the driveway that first week, and I'll tell you when the floor is ready for the car.
Probably a little, and that's normal. National industry guidance says a crack-free, curl-free floor isn't realistic even with the best design and proper construction, so plan on some cracking and some curling, which is when the edges lift slightly as the slab dries. The base and joints described above keep those cracks small and in the places we picked.
Industry guidance says to cover the new slab with a liquid curing compound or wet burlap, which lets the concrete reach its highest potential strength. A slab that dries out too fast ends up weaker at the top. Ask which method we'll use on your floor, and I'll tell you at the estimate.
Ask how they schedule the finishing, the joint cutting and the curing, because industry guidance calls that timing critical to a good slab. When the timing is wrong, you can end up with cracks, a dusty or flaking surface, high and low spots, and water that won't drain out the door. It's also worth asking who writes the estimate and who will be on site running the pour.